ExxonMobil Corp. has planned a maintenance shutdown at Campana Refinery (Buenos Aires, Argentina). The maintenance shutdown of its catalytic reformer is planned to commence on April 10, 2008. A maintenance shutdown is also scheduled for the middle distillation treatment, aromatic hydrotreatment, naphtha stabilizer and coke naphtha hydrofiner units. These units have to be shut down because of the lack of hydrogen feed from the catalytic reformer.
Thursday, April 17, 2008
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment