After a month of reduced output, Taiwan's Formosa Petrochemical Corp. has resumed 100% operations at its 700,000 tpa cracker. The No.1 cracker was idled in early April for about five days, but damage to its furnace tube during the outage prevented the cracker from operating at more than 80% capacity.
For more details on Formosa resumes production at 700,000 tpa cracker: issues spot tender for 75,000 tons naphtha click here
Monday, May 12, 2008
Formosa resumes production at 700,000 tpa cracker: issues spot tender for 75,000 tons naphtha
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment