Sinopec Maoming's 380,000 tpa naphtha cracker has experienced technical problems at a downstream unit, due to which the cracker has been shut. Operations are expected to resume within two weeks.
Tuesday, October 09, 2007
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment